ERP Manufacturing Module Training

Bill of materials, routing, work orders, production planning, job cards and cost calculation.

ERP Manufacturing Module Training
Intro videoSoon

About this training

Bill of materials, routing, work orders, production planning, job cards and cost calculation.

  • Bill of Materials
  • Workstations and Operations
  • Work Order
  • Production Plan
  • Job Card
  • Costing and Scrap
  • Manufacturing Reports

Training outline 7 lessons

1Bill of Materials

1. Create a BOM and select the finished item.
2. Enter raw materials and quantity per unit.
3. Add sub-assemblies with a multi-level BOM if needed.
4. Submit and set as default; cost is calculated automatically.

The video and file for this session will be added soon.

2Workstations and Operations

1. Define Workstations with working hours and hourly rate.
2. Create Operations (cutting, assembly, packing).
3. Add operations and times to the BOM so operation cost is included.

The video and file for this session will be added soon.

3Work Order

1. Create a Work Order; set item, BOM and quantity.
2. Set raw-material, work-in-progress and finished-goods warehouses.
3. Submit and Start.
4. Use Stock Entries to transfer materials and receive the finished product.

The video and file for this session will be added soon.

4Production Plan

1. Create a Production Plan and pull sales orders or material requests.
2. Click Get Items for the items to produce.
3. Get Raw Materials shows material needs.
4. Generate work orders and material requests from here.

The video and file for this session will be added soon.

5Job Card

1. A Job Card is created for each operation in the work order.
2. The operator logs start and end times.
3. Enter the completed quantity and submit.
4. Actual time is compared with planned time.

The video and file for this session will be added soon.

6Costing and Scrap

1. Cost comes from consumed materials, operation cost and overheads.
2. Record scrap in the BOM or on the stock entry.
3. Compare actual with standard cost.

The video and file for this session will be added soon.

7Manufacturing Reports

1. Work Order Summary shows production order status.
2. Check Material Consumption and Workstation capacity.
3. Analyse scrap and delays to improve the process.

The video and file for this session will be added soon.

Contact us

Share your questions, feedback and comments with us:

Contact form

Request a free consultation

Leave your number; our colleagues will call you to choose the best solution.